A durable surface starts below the asphalt.

Ground, levels and drainage

Before mobilisation, confirm ground conditions, design loading, connection levels and a reliable stormwater route. These factors matter more to service life than the visible asphalt layer.

  • survey and existing utilities
  • bearing capacity and moisture
  • longitudinal and cross falls
  • ditches, culverts, inlets or stormwater network

Formation and bearing layers

Weak ground is replaced or stabilised and materials are placed in controlled layers. The next layer should not conceal an untested or saturated base.

  • excavation and preparation
  • frost-resistant and aggregate layers
  • grading and compaction control
  • protection of chambers, culverts and utilities

Kerbs, surfacing and connections

Kerbs establish geometry and levels. Asphalt follows base acceptance, a weather check and coordinated material deliveries.

  • kerb lines and accessible crossings
  • bond coat and asphalt placement
  • chamber and existing-surface connections
  • shoulders, markings and final reinstatement

What to send for pricing

Provide a plan with areas and lengths, pavement layers, scope limits, location and programme. If no design exists yet, BIMARKS can begin with photographs, approximate dimensions and a site visit.